Bathroom Remodeling

Bathroom Remodeling

Project Details

This bathroom remodel used a light tile palette, floating wood vanity, illuminated mirror, and updated shower details to create a clean modern bathroom.

  • Location Los Angeles area
  • Project Bathroom Remodeling
  • Scope Bathroom remodel with floating wood vanity, illuminated mirror, shower tile, bathtub area, and fixture updates.
  • Timeline Typically 4-8 weeks, depending on tile and fixture scope
  • Estimated Cost Available after a project-specific estimate

Work Completed

  • Bathroom preparation and waterproofing
  • Shower and wall tile installation
  • Floating vanity, sink, mirror, and fixture setup
  • Tub area, trim, and final finish work

Project Highlights

  • Floating wood vanity
  • Illuminated mirror and niche lighting
  • Bright tile surfaces throughout

Result

The completed bathroom is brighter and more contemporary, with useful storage and a cleaner bathing area.

Plan a Similar Project

Project Gallery

15 Photos